Day 29... we have a floor
 ... and a ceiling for the basement!


Day 32... first floor is framed!
 Trusses for the roof!
 View from the back door, through the foyer, towards the front door.
 Day 33... prepping for the second floor... from the front door.
 Prepping for the second floor... great room.
 Day 34... second floor... from the front door.
 Second floor... great room.
 Day 35... exterior walls for the second floor!

Today should be Day 36, but we started with heavy rains, so hopefully they can get some things done up there this afternoon.  We're chugging right along!